In August 2019, RMS Cranes & RMS Rigging successfully completed the move of a 300,000 lb transformer from one side of Colorado Springs to the other. Utilizing a 200 ton Jack & Slide System, the load was trans-loaded from rail to our 6-axle Goldhofer SMPT trailer, which then needed to be trans-loaded to our Goldhofer 12-axle dual-lane trailer for crosstown transport. The haul across Colorado Springs required night travel due to the overall size and weight of the configuration. The move took approximately 7 hours to complete the 10 mile journey as a total of 18 traffic lights needed to be moved with bucket rucks and light technicians. Once the load made it to the sub station, one more trans-load to the SPMT was required before a 500 Ton hydraulic crane offloaded and completed the project.
Dual-Lane Overall Dimensions
|
CATEGORIES
All
ARCHIVES
March 2021
|
RMS CRANES |
1961 E. 64th Avenue
Denver, CO 80229 1.800.588.7095 1.303.794.7095 afterhours@rmscranes.com info@rmscranes.com rmscranes.com rmsrigging.com jsmobileinc.com |
|
©
2021 RMS Cranes | All Rights Reserved